Sale!

ABB REB670 1MRK004822-AC | 12 ms Operate, IEC 61850

Original price was: $5,464.00.Current price is: $3,423.00.

Product Core Brief

  • Model: REB670 1MRK004822-AC
  • Brand: ABB
  • Series: Relion 670 series
  • Core Function: Busbar and multipurpose differential protection
  • Type: Intelligent Electronic Device (IED)
  • Key Specs: Up to 6 zones, 12 ms operate, 1/5 A CT, IEC 61850
  • Condition: Verify stock status; New Original (New Surplus) if supplied as such
  • Note: Related REB670 ordering codes include 1MRK004822-BB and 1MRK004822-BC
Category: SKU: REB670 1MRK004822-AC ABB
  • Email:sales@sxrunsheng.cn
  • Phone:+86 15340667322
  • Whatsapp:+86 15340667322
  • Description

    Key Technical Specifications

    • Model: REB670 1MRK004822-AC
    • Brand: ABB
    • Product type: Busbar and multipurpose differential protection relay
    • Application: MV to EHV busbars, T-connections, meshed corners
    • Zones: Up to six zones
    • Fault detection: Phase-to-phase, phase-to-earth, multi-phase faults
    • Voltage levels: Medium to extra-high voltage
    • Protection schemes: Single, double, triple busbar with/without transfer bus
    • Breaker arrangements: Double-circuit breaker and one-and-half breaker
    • Rated frequency: 50/60 Hz (±10%)
    • Rated current Ir: 1 A or 5 A
    • Auxiliary voltage: 24–60 V DC ±20% or 90–250 V DC ±20%
    • Communication: IEC 61850, GOOSE, PRP, HSR

    ABB REB670 1MRK004822-AC | 12 ms Operate, IEC 61850

     

    Product Introduction

    ABB REB670 1MRK004822-AC is a busbar and multipurpose differential protection IED for MV to EHV applications. ABB REB670 1MRK004822-AC is used in substation busbars, T-connections, and meshed corners, and it handles phase-to-phase and phase-to-earth faults in solidly or low-impedance earthed systems, plus multi-phase faults in isolated or high-impedance earthed systems.

    This unit is chosen when the system needs selective, fast fault clearance across up to six zones, with a typical 12 ms operate time for internal faults. Confirm the exact CT circuits, zone configuration, and auxiliary supply before installation, because the wrong zone logic or CT burden can cause instability even if the hardware fits.