Sale!

ABB REF615C_D | OEM Protection Relay with 1-Year Warranty

Original price was: $6,575.00.Current price is: $3,453.00.

Product Core Brief

  • Model: REF615C_D HCFCACABNNA2BAN1XD
  • Brand: ABB
  • Series: Relion® 615
  • Core Function: Monitors and protects medium-voltage feeders
  • Type: Feeder Protection and Control Relay
  • Key Specs: IEC 61850 communication, 1 A / 5 A CT input, PRP/HSR redundancy
  • Condition: New Original (New Surplus)
  • Availability: In Stock
  • Warranty: 12 Months
Category: SKU: REF615C_D HCFCACABNNA2BAN1XD ABB
  • Email:sales@sxrunsheng.cn
  • Phone:+86 15340667322
  • Whatsapp:+86 15340667322
  • Description

    Product Introduction

    Data first — the ABB REF615C_D HCFCACABNNA2BAN1XD is a medium-voltage feeder protection relay designed for substations, industrial switchgear, and utility distribution panels. It integrates protection, monitoring, breaker control, and communication into a single plug-in device, supporting IEC 61850 protocols for digital substations.

    Installation teams value that the REF615C_D executes directional and non-directional overcurrent protection with a trip response <20 ms. PRP/HSR redundancy ensures communication reliability, while Modbus RTU/TCP and DNP3 allow straightforward integration into SCADA and automation networks. Lead time for verified stock is usually 2–3 weeks.

    ABB REF615C_D | OEM Protection Relay with 1-Year Warranty

     

    Installation & Configuration Guide

    Phase 1 — Pre-Installation

    • De-energize panel; wait 5 min for capacitor discharge
    • Tools: Fluke 115 multimeter, ESD strap, insulated screwdriver, torque wrench
    • Export relay settings from PCM600
    • Photograph jumper/DIP switch settings, CT/PT wiring, and rack layout

    Phase 2 — Removal

    • Label wires before disconnecting
    • Release retaining latch carefully
    • Pull module perpendicular to backplane guides
    • Inspect connector pins for corrosion, bent contacts, or burn marks

    Phase 3 — Installation

    • Connect wrist strap; verify ESD mat
    • Confirm ABB REF615C_D part number
    • Replicate DIP switch/jumper configuration from photos
    • Insert relay until latch clicks; reconnect wiring at 0.5 N·m
    • Verify CT polarity and shield grounding

    Phase 4 — Power-On & Testing

    • Verify auxiliary voltage (24 V DC ±10% or AC nominal)
    • Observe LEDs: green = RUN, red = ERR, amber = DIAG
    • Connect PCM600; download or validate program
    • Run I/O simulation and communication handshake
    • Test one complete feeder trip sequence
    • Monitor >30 min stable operation
    • Log firmware version and swap in maintenance record

    Troubleshooting Quick Reference

    • No comms → check IP, cable, switch port
    • ERR steady → firmware mismatch or invalid configuration
    • Download fails → confirm PCM600 version and cable type