Sale!

GE CT12AUF2K0MA | Genuine Medium Voltage Transformer OEM

Original price was: $6,786.00.Current price is: $3,453.00.

Product Core Brief

  • Model: GE CT12AUF2K0MA
  • Brand: GE (General Electric)
  • Series: CT12 Series
  • Core Function: Converts 10 kV to 12 kV primary line current into standard 5 A secondary current for metering and protection.
  • Type: Indoor Epoxy Resin Cast Current Transformer
  • Key Specs: 12 kV rated insulation voltage, 0.2S / 10P accuracy class combination, 5 A rated secondary output
  • Condition: New Original (New Surplus) — not refurbished
Category: SKU: CT12AUF2K0MA GE
  • Email:sales@sxrunsheng.cn
  • Phone:+86 15340667322
  • Whatsapp:+86 15340667322
  • Description

    Product Introduction

    The GE CT12AUF2K0MA current transformer transforms 10 kV to 12 kV primary medium-voltage currents down to standard 5 A secondary signals for switchgear metering and relay protection. Designed for indoor switchgear assemblies such as KYN28 cabinets, this unit provides electrical isolation between high-voltage busbars and secondary instruments. Bottom line — it works.

    Vacuum-cast epoxy resin encases both measurement and protection cores into a single monolithic body, preventing internal partial discharge below 10 pC. Operating across -25 to +55 °C, the dual-winding system maintains 0.2S class precision for utility billing while delivering 10P protection response during short-circuit faults. Honestly, integrating billing-grade metering with anti-saturation fault protection into one block is actually clever for saving switchgear compartment space.

    GE CT12AUF2K0MA | Genuine Medium Voltage Transformer OEM

     

    Installation & Configuration Guide

    Phase 1 — Pre-Installation (est. 10 min)

    1. Lock out and tag out the main feeder circuit breaker feeding the switchgear bay.
    2. Ground all primary phase busbars and wait 5 minutes for discharge.
    3. Bring a 2,500 V megohmmeter, a torque wrench, a Fluke 115 multimeter, and protective footwear.
    4. Export protection relay settings and photograph terminal wiring labels before touching cables.

    Phase 2 — Removal (est. 5 min)

    1. Disconnect secondary terminal wires from terminal blocks $1S1$, $1S2$, $2S1$, and $2S2$.
    2. Remove primary busbar mounting bolts connecting the transformer primary terminals.
    3. Support the physical weight of the transformer body using a lift harness.
    4. Unbolt chassis base mounting hardware and extract the transformer straight outward from the compartment.

    Phase 3 — Installation (est. 10 min)

    1. Put on an anti-static wrist strap before touching secondary electronic interface equipment.
    2. Inspect the nameplate to confirm the part number reads GE CT12AUF2K0MA.
    3. Position the transformer onto cabinet base rails and tighten mounting bolts to 25 N·m.
    4. Connect primary copper busbars to high-voltage terminals using M12 hardware torqued to 45 N·m.
    5. Wire secondary terminals $1S1/1S2$ (metering) and $2S1/2S2$ (protection) securely, ensuring secondary circuits are never open-circuited under load.

    Phase 4 — Power-On & Testing (est. 15 min)

    1. Measure primary-to-secondary and primary-to-ground insulation resistance using a 2,500 V megohmmeter.
    2. Inject a low-voltage test current into the primary winding to verify secondary current ratio and polarity ($P1-P2$ vs $S1-S2$).
    3. Remove safety grounding jumpers and close the bay enclosure doors.
    4. Energize the 12 kV incoming busbar.
    5. Monitor secondary current readings on downstream digital meters for 30 minutes to confirm continuous signal integrity.

    Quality Verification SOP

    In field deployments of medium-voltage switchgear, rigorous component validation prevents catastrophic flashovers and revenue metering errors. Every GE CT12AUF2K0MA unit undergoes strict physical and electrical verification prior to dispatch:

    • Incoming Inspection: We verify OEM packing lists, customs documentation, and serial tags. Technicians inspect the epoxy resin body under bright light for micro-cracks, surface voiding, terminal thread damage, or surface contamination.
    • Live Functional Test: Placing the unit on a current injection test stand, we inject primary currents up to rated levels. We verify ratio errors across 1% to 120% nominal current and log excitation curves for the 10P protection core over a continuous 24-hour heat-run test. A formal Test Report accompanies every unit.
    • Electrical Tests: We test primary-to-ground and primary-to-secondary insulation using a 2,500 V megohmmeter (confirming >1,000 MΩ). Power-frequency withstand capability is verified up to 42 kV for 1 minute.
    • Ratio & Polarity Verification: Secondary polarity is verified through pulse testing, and terminal designation markings are photographed for quality records.
    • Final QC & Packaging: After technician sign-off, the unit is wrapped in heavy moisture-proof plastic film, cushioned with high-density shock foam inside a reinforced wooden crate, and sealed with a dated QC Passed badge.

    (Note: Full test photos and raw injection test logs are available on request. All units are confirmed functional after completing all verification steps listed above.)