Product Core Brief
- Model: REM615 HBMCAEAGBCC6АNN1XG
- Brand: ABB
- Series: Relion 615 Series
- Core Function: Medium-voltage motor protection with integrated monitoring
- Type: Motor Protection and Control Relay
- Key Specs: IEC 61850 communication, 1 A / 5 A CT inputs, optional arc flash mitigation
- Condition: New Original (New Surplus) — not refurbished
- Lead Time: Typically 3–10 working days depending on stock region
- Warranty: 12 months standard seller warranty
- Pricing Note: Reference pricing only; actual quote depends on firmware version, stock condition, and destination.
Product Introduction
For medium-voltage motor feeders in industrial plants, the ABB REM615 HBMCAEAGBCC6АNN1XG relay integrates protection, control, and monitoring in one compact withdrawable unit. It belongs to ABB’s Relion 615 series and meets IEC 61850 communication standards.
Trip response is under 25 ms for typical overload conditions. Thermal and voltage protection logic is included. Withdrawable design allows offline testing without disconnecting the backplane. This layout is actually clever during maintenance because it reduces downtime on live systems.
Installation & Configuration Guide
Phase 1 — Pre-Installation (est. 10 min)
- De-energize cubicle; wait 5 min for capacitor discharge
- Use insulated tools, ESD wrist strap, Fluke 115 multimeter
- Export relay settings, save disturbance records
- Photograph DIP switches, terminal blocks, and rack layout
Phase 2 — Removal (est. 5 min)
- Label all wires
- Release withdrawable latch, pull perpendicular
- Inspect backplane pins, ground contacts, and fiber ports
Phase 3 — Installation (est. 10 min)
- Verify part number, firmware version, and CT/VT ratios
- Replicate DIP/jumper settings from photos
- Seat until latch clicks, torque terminals ~0.5 N·m
- Confirm shield grounding and fiber orientation
Phase 4 — Power-On & Testing (est. 15 min)
- Confirm 24 V DC ±10% control power
- Observe LEDs: Green = RUN, Red flash = ERR, Amber flash = DIAG
- Connect PCM600, read and download settings
- Functional tests: I/O simulation, full motor start sequence, thermal overload alarms
- Run 30-min stability check
- Record firmware and test results in maintenance log
Electrical Tests:
- Insulation >10 MΩ using 500 V megohmmeter
- Ground continuity
- Dielectric withstand if applicable
- Test photos available on request