Product Core Brief

  • Model: HBFHAEAGABC1BBN11G
  • Brand: ABB
  • Series: Relion® 615 (REF615)
  • Core Function: Feeder protection and control relay for MV distribution networks
  • Type: Feeder Protection & Control IED
  • Key Specs: Directional/non-directional overcurrent & earth-fault; IEC 61850 Ed. 1/2 + Modbus/DNP3; 24 V–250 V DC/AC wide-range supply
  • Condition: New Original (New Surplus) — not refurbished
Category: SKU: REF615 HBFHAEAGABC1BBN11G ABB
  • Email:sales@sxrunsheng.cn
  • Phone:+86 15340667322
  • Whatsapp:+86 15340667322
  • Description

    Product Introduction

    ABB REF615 HBFHAEAGABC1BBN11G is a feeder protection relay for utility and industrial MV distribution. It protects overhead lines and cable feeders in radial, looped, and meshed networks, with or without distributed generation.

    This unit supports directional and non-directional overcurrent and earth-fault, plus voltage, frequency, and power-based functions. It comes with IEC 61850 Ed. 1/2 (GOOSE, IEC 61850-9-2 LE), Modbus, DNP3, and IEC 60870-5-103. The withdrawable plug-in design speeds replacement. Honestly, that cuts swap time in the field.

    ABB REF615 HBFHAEAGABC1BBN11G | IEC 61850 Feeder IED Fast Ship

    Installation & Configuration Guide

     

    Phase 1—Pre-Installation (est. 10 min)

    • De-energize the bay. Lockout/tagout.
    • Wait 5 min for discharge.
    • Export the existing relay program.
    • Photograph DIP switches, wiring, and rack layout.
    • Tools: Fluke 115 multimeter, ESD wrist strap, torque driver, label tags.

     

    Phase 2—Removal (est. 5 min)

    • Label wires before disconnecting.
    • Release the latch.
    • Pull the unit straight out.
    • Inspect backplane pins for bent contacts, oxidation, or heat marks.

     

    Phase 3—Installation (est. 10 min)

    • Put ESD protection on first.
    • Verify the exact part number.
    • Replicate jumper and terminal settings from photos.
    • Seat the module until the latch clicks.
    • Reconnect wiring at about 0.5 N·m.
    • Check shield grounding against the wiring diagram.